one.Merchandise parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany kind can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./eight./eight.5 |
kingpin | 2"/three.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | one |
air wiring | doule air line |
electric power wiring | six core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma chopping equipment minimize the metal to minor components use for appropriate welding and splicing
2)welding
after steel reducing approach the up coming phase is welding .this method the primary perform is beam welding .the prime plate-base plate and the
middle plate will be welding with each other . this approach will be use submerged arc welding procedure.this sort of welding is very
unique .its completely utilized in I beam welding .soon after this welding procedure other components of the trailer will be use different welding way
for different metal-argon arc welding-electric arc welding-guide welding-gasoline welding and so on
3)blasting
this approach is use for the 1st stage of area cleanness-stress relief-derusting prior to paiting .
4)electrophoresis coating
this method use for a lot more detail area cleanness
five)epoxy zinc primer spray coating
this approach is the long lasting a single just before paiting .right after this approach the trailer an be paiting
six)assembly
right after all the approach we have mationed .the final treatment of the trailer is assembly.this method all the elements will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake system and so on
seven)packing
The last procedure is packing .all the trailer use distinct packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer