1.Product parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany variety can be opentional |
tire | 11R22.five/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.25/9./8./eight.5 |
kingpin | two"/3.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | 1 |
air wiring | doule air line |
electric power wiring | six main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma reducing device minimize the metal to minor components use for ideal welding and splicing
2)welding
following metal slicing method the up coming stage is welding .this approach the major perform is beam welding .the prime plate-bottom plate and the
middle plate will be welding together . this method will be use submerged arc welding process.this type of welding is very
specific .its exclusively utilized in I beam welding .soon after this welding approach other areas of the trailer will be use diverse welding way
for various steel-argon arc welding-electrical arc welding-guide welding-gasoline welding and so on
three)blasting
this approach is use for the 1st step of surface area cleanness-pressure reduction-derusting just before paiting .
4)electrophoresis coating
this method use for far more element surface cleanness
5)epoxy zinc primer spray coating
this procedure is the long lasting a single just before paiting .following this approach the trailer an be paiting
six)assembly
right after all the method we have mationed .the final treatment of the trailer is assembly.this method all the components will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake technique and so on
7)packing
The last procedure is packing .all the trailer use different packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer