1.Product parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany kind can be opentional |
tire | 11R22.five/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./8./8.5 |
kingpin | two"/three.five" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | one |
air wiring | doule air line |
electric power wiring | 6 main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma reducing equipment cut the metal to minor areas use for suitable welding and splicing
2)welding
following steel slicing procedure the subsequent action is welding .this process the primary perform is beam welding .the best plate-base plate and the
middle plate will be welding with each other . this procedure will be use submerged arc welding approach.this type of welding is quite
particular .its completely employed in I beam welding .right after this welding process other elements of the trailer will be use various welding way
for distinct steel-argon arc welding-electric powered arc welding-handbook welding-gas welding and so on
3)blasting
this approach is use for the 1st action of floor cleanness-tension aid-derusting ahead of paiting .
four)electrophoresis coating
this approach use for far more detail floor cleanness
5)epoxy zinc primer spray coating
this process is the long lasting one particular before paiting .right after this process the trailer an be paiting
6)assembly
after all the procedure we have mationed .the final method of the trailer is assembly.this procedure all the parts will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake system and so on
7)packing
The last approach is packing .all the trailer use various packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer