1.Item parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany kind can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/9./eight./8.5 |
kingpin | 2"/3.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
tool box | one |
air wiring | doule air line |
electrical energy wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma slicing device minimize the steel to small components use for suited welding and splicing
two)welding
right after steel cutting process the next stage is welding .this procedure the main operate is beam welding .the leading plate-bottom plate and the
middle plate will be welding jointly . this process will be use submerged arc welding procedure.this sort of welding is quite
particular .its exclusively used in I beam welding .following this welding process other areas of the trailer will be use distinct welding way
for various metal-argon arc welding-electric powered arc welding-handbook welding-gasoline welding and so on
3)blasting
this method is use for the first stage of surface cleanness-pressure reduction-derusting before paiting .
four)electrophoresis coating
this procedure use for more depth surface cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting 1 ahead of paiting .soon after this approach the trailer an be paiting
six)assembly
after all the process we have mationed .the last process of the trailer is assembly.this method all the elements will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake method and so on
7)packing
The last procedure is packing .all the trailer use diverse packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer