one.Merchandise parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | 8.25/nine./8./eight.5 |
kingpin | 2"/3.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | one |
air wiring | doule air line |
electricity wiring | six core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma slicing machine minimize the metal to tiny parts use for suitable welding and splicing
two)welding
following steel reducing method the up coming stage is welding .this process the primary perform is beam welding .the top plate-bottom plate and the
middle plate will be welding together . this approach will be use submerged arc welding process.this kind of welding is really
specific .its solely utilized in I beam welding .soon after this welding approach other components of the trailer will be use diverse welding way
for distinct metal-argon arc welding-electrical arc welding-guide welding-gasoline welding and so on
3)blasting
this method is use for the initial stage of surface cleanness-pressure aid-derusting prior to paiting .
4)electrophoresis coating
this procedure use for more element surface cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting one before paiting .soon after this approach the trailer an be paiting
six)assembly
following all the approach we have mationed .the previous treatment of the trailer is assembly.this procedure all the areas will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake method and so on
7)packing
The last method is packing .all the trailer use distinct packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer