1.Merchandise parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany type can be opentional |
tire | 11R22.5/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.25/nine./eight./8.5 |
kingpin | 2"/3.five" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | one |
air wiring | doule air line |
electrical energy wiring | six core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma slicing device minimize the metal to little components use for appropriate welding and splicing
two)welding
following steel slicing procedure the subsequent action is welding .this process the principal function is beam welding .the best plate-base plate and the
middle plate will be welding with each other . this approach will be use submerged arc welding procedure.this sort of welding is extremely
unique .its exclusively utilized in I beam welding .after this welding approach other components of the trailer will be use different welding way
for different metal-argon arc welding-electrical arc welding-guide welding-fuel welding and so on
three)blasting
this approach is use for the first action of floor cleanness-stress aid-derusting ahead of paiting .
4)electrophoresis coating
this procedure use for a lot more element surface cleanness
five)epoxy zinc primer spray coating
this method is the long lasting 1 before paiting .right after this method the trailer an be paiting
6)assembly
following all the process we have mationed .the very last treatment of the trailer is assembly.this approach all the parts will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake technique and so on
7)packing
The final method is packing .all the trailer use different packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer