one.Merchandise parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany sort can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/nine./8./eight.5 |
kingpin | two"/three.five" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | 1 |
air wiring | doule air line |
electric power wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma slicing equipment lower the steel to little elements use for ideal welding and splicing
2)welding
following steel cutting process the up coming phase is welding .this process the major operate is beam welding .the leading plate-base plate and the
middle plate will be welding together . this procedure will be use submerged arc welding procedure.this variety of welding is very
unique .its solely used in I beam welding .following this welding approach other parts of the trailer will be use different welding way
for various steel-argon arc welding-electric powered arc welding-handbook welding-gasoline welding and so on
three)blasting
this procedure is use for the initial action of surface cleanness-stress reduction-derusting prior to paiting .
4)electrophoresis coating
this method use for far more depth surface cleanness
5)epoxy zinc primer spray coating
this approach is the lasting one particular ahead of paiting .right after this process the trailer an be paiting
6)assembly
following all the procedure we have mationed .the very last process of the trailer is assembly.this method all the parts will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake program and so on
seven)packing
The previous process is packing .all the trailer use diverse packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer