1.Product parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany type can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/9./eight./eight.5 |
kingpin | 2"/3.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | one |
air wiring | doule air line |
electrical power wiring | 6 core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma chopping machine lower the steel to little elements use for appropriate welding and splicing
two)welding
right after metal slicing approach the up coming phase is welding .this method the main function is beam welding .the best plate-base plate and the
middle plate will be welding jointly . this process will be use submerged arc welding approach.this sort of welding is extremely
particular .its solely utilised in I beam welding .soon after this welding approach other components of the trailer will be use distinct welding way
for distinct steel-argon arc welding-electric arc welding-handbook welding-gas welding and so on
3)blasting
this process is use for the first stage of surface cleanness-stress relief-derusting just before paiting .
4)electrophoresis coating
this method use for much more depth surface cleanness
5)epoxy zinc primer spray coating
this process is the lasting a single prior to paiting .following this approach the trailer an be paiting
six)assembly
after all the procedure we have mationed .the last procedure of the trailer is assembly.this approach all the components will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake system and so on
seven)packing
The very last method is packing .all the trailer use distinct packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer