1.Merchandise parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany sort can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/nine./eight./8.5 |
kingpin | 2"/three.five" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | 1 |
air wiring | doule air line |
electrical energy wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma cutting machine lower the steel to tiny elements use for suited welding and splicing
two)welding
soon after steel slicing approach the following stage is welding .this procedure the principal function is beam welding .the top plate-bottom plate and the
middle plate will be welding jointly . this approach will be use submerged arc welding method.this sort of welding is extremely
specific .its completely used in I beam welding .right after this welding approach other areas of the trailer will be use different welding way
for distinct steel-argon arc welding-electric arc welding-handbook welding-gas welding and so on
3)blasting
this procedure is use for the initial step of surface area cleanness-pressure aid-derusting prior to paiting .
4)electrophoresis coating
this process use for far more depth floor cleanness
five)epoxy zinc primer spray coating
this method is the lasting one before paiting .following this procedure the trailer an be paiting
6)assembly
soon after all the process we have mationed .the previous treatment of the trailer is assembly.this approach all the parts will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake system and so on
7)packing
The final approach is packing .all the trailer use distinct packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer