one.Solution parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany variety can be opentional |
tire | 11R22.5/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/9./eight./8.5 |
kingpin | 2"/three.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
tool box | 1 |
air wiring | doule air line |
electric power wiring | six core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma chopping equipment lower the metal to minor areas use for suitable welding and splicing
2)welding
right after metal chopping process the following phase is welding .this process the primary perform is beam welding .the best plate-bottom plate and the
middle plate will be welding with each other . this process will be use submerged arc welding procedure.this type of welding is quite
specific .its exclusively utilised in I beam welding .soon after this welding method other areas of the trailer will be use different welding way
for diverse steel-argon arc welding-electric powered arc welding-manual welding-fuel welding and so on
3)blasting
this method is use for the 1st phase of surface cleanness-anxiety relief-derusting just before paiting .
four)electrophoresis coating
this method use for much more detail floor cleanness
five)epoxy zinc primer spray coating
this procedure is the long lasting one particular before paiting .after this method the trailer an be paiting
6)assembly
soon after all the procedure we have mationed .the final process of the trailer is assembly.this procedure all the elements will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake program and so on
7)packing
The very last approach is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer