one.Item parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany type can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./eight./eight.5 |
kingpin | two"/three.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | one |
air wiring | doule air line |
electricity wiring | 6 core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma chopping machine lower the steel to little elements use for ideal welding and splicing
2)welding
right after steel chopping process the subsequent stage is welding .this procedure the main perform is beam welding .the leading plate-bottom plate and the
middle plate will be welding together . this procedure will be use submerged arc welding approach.this sort of welding is extremely
special .its completely utilized in I beam welding .right after this welding method other components of the trailer will be use different welding way
for distinct metal-argon arc welding-electrical arc welding-guide welding-gasoline welding and so on
three)blasting
this approach is use for the first action of surface area cleanness-stress relief-derusting before paiting .
4)electrophoresis coating
this approach use for more detail area cleanness
five)epoxy zinc primer spray coating
this method is the lasting one particular just before paiting .right after this method the trailer an be paiting
six)assembly
after all the procedure we have mationed .the previous procedure of the trailer is assembly.this procedure all the parts will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake program and so on
7)packing
The last process is packing .all the trailer use diverse packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer