one.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany variety can be opentional |
tire | 11R22.five/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./8./8.5 |
kingpin | 2"/three.five" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | 1 |
air wiring | doule air line |
electrical energy wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma slicing device cut the metal to little areas use for appropriate welding and splicing
2)welding
following steel reducing procedure the next step is welding .this method the primary perform is beam welding .the prime plate-bottom plate and the
middle plate will be welding together . this method will be use submerged arc welding process.this kind of welding is extremely
specific .its solely utilised in I beam welding .after this welding approach other elements of the trailer will be use different welding way
for different steel-argon arc welding-electrical arc welding-manual welding-gas welding and so on
three)blasting
this approach is use for the initial step of floor cleanness-pressure relief-derusting ahead of paiting .
four)electrophoresis coating
this method use for much more detail surface cleanness
5)epoxy zinc primer spray coating
this process is the long lasting 1 just before paiting .right after this process the trailer an be paiting
6)assembly
after all the process we have mationed .the last process of the trailer is assembly.this method all the parts will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake technique and so on
7)packing
The previous approach is packing .all the trailer use distinct packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer