1.Solution parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany sort can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | 8.25/9./eight./eight.5 |
kingpin | two"/3.five" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | one |
air wiring | doule air line |
electricity wiring | six main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma reducing device reduce the steel to small elements use for suitable welding and splicing
2)welding
right after metal slicing method the following stage is welding .this process the major function is beam welding .the top plate-base plate and the
middle plate will be welding jointly . this process will be use submerged arc welding process.this kind of welding is really
special .its exclusively utilised in I beam welding .after this welding approach other components of the trailer will be use various welding way
for various steel-argon arc welding-electric arc welding-handbook welding-fuel welding and so on
3)blasting
this procedure is use for the first phase of surface area cleanness-stress aid-derusting before paiting .
4)electrophoresis coating
this process use for more element surface area cleanness
5)epoxy zinc primer spray coating
this approach is the long lasting 1 prior to paiting .soon after this process the trailer an be paiting
6)assembly
right after all the method we have mationed .the very last treatment of the trailer is assembly.this method all the parts will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake system and so on
seven)packing
The very last approach is packing .all the trailer use various packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer