one.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/nine./8./8.5 |
kingpin | two"/3.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | one |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma cutting machine lower the metal to minor parts use for appropriate welding and splicing
two)welding
right after steel chopping procedure the next stage is welding .this procedure the major work is beam welding .the leading plate-base plate and the
middle plate will be welding collectively . this procedure will be use submerged arc welding process.this sort of welding is quite
particular .its completely utilised in I beam welding .soon after this welding procedure other parts of the trailer will be use diverse welding way
for different steel-argon arc welding-electrical arc welding-guide welding-gas welding and so on
three)blasting
this method is use for the first stage of floor cleanness-stress reduction-derusting prior to paiting .
4)electrophoresis coating
this approach use for much more depth surface area cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting one particular prior to paiting .right after this method the trailer an be paiting
6)assembly
after all the approach we have mationed .the very last procedure of the trailer is assembly.this approach all the elements will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake method and so on
seven)packing
The previous method is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer