one.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany variety can be opentional |
tire | 11R22.5/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/9./eight./eight.5 |
kingpin | 2"/three.five" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | 1 |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma slicing machine cut the steel to minor elements use for ideal welding and splicing
2)welding
following metal cutting procedure the next action is welding .this procedure the principal perform is beam welding .the prime plate-base plate and the
middle plate will be welding jointly . this method will be use submerged arc welding approach.this variety of welding is really
specific .its completely utilized in I beam welding .right after this welding procedure other parts of the trailer will be use different welding way
for different metal-argon arc welding-electric powered arc welding-handbook welding-fuel welding and so on
three)blasting
this approach is use for the 1st phase of floor cleanness-pressure aid-derusting ahead of paiting .
four)electrophoresis coating
this process use for far more depth surface area cleanness
5)epoxy zinc primer spray coating
this approach is the lasting one particular just before paiting .after this process the trailer an be paiting
six)assembly
right after all the procedure we have mationed .the very last procedure of the trailer is assembly.this procedure all the elements will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
seven)packing
The very last approach is packing .all the trailer use different packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer