1.Solution parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany type can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/nine./eight./eight.5 |
kingpin | 2"/three.five" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | 1 |
air wiring | doule air line |
electric power wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma reducing device cut the metal to tiny parts use for suited welding and splicing
2)welding
soon after metal reducing procedure the following action is welding .this procedure the major operate is beam welding .the best plate-base plate and the
middle plate will be welding jointly . this process will be use submerged arc welding method.this type of welding is very
specific .its exclusively utilised in I beam welding .right after this welding procedure other elements of the trailer will be use diverse welding way
for distinct steel-argon arc welding-electric powered arc welding-handbook welding-gas welding and so on
3)blasting
this process is use for the initial phase of surface area cleanness-tension aid-derusting prior to paiting .
four)electrophoresis coating
this process use for far more element area cleanness
5)epoxy zinc primer spray coating
this method is the long lasting 1 prior to paiting .following this approach the trailer an be paiting
six)assembly
after all the procedure we have mationed .the final treatment of the trailer is assembly.this approach all the parts will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
7)packing
The previous procedure is packing .all the trailer use various packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer