one.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany kind can be opentional |
tire | 11R22.five/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/nine./8./eight.5 |
kingpin | 2"/3.five" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | 1 |
air wiring | doule air line |
electrical power wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma reducing device lower the metal to minor elements use for suitable welding and splicing
2)welding
after steel chopping method the following phase is welding .this process the main work is beam welding .the top plate-bottom plate and the
middle plate will be welding together . this method will be use submerged arc welding process.this kind of welding is extremely
special .its solely employed in I beam welding .right after this welding method other areas of the trailer will be use different welding way
for distinct steel-argon arc welding-electric powered arc welding-handbook welding-fuel welding and so on
3)blasting
this approach is use for the first stage of floor cleanness-pressure aid-derusting just before paiting .
4)electrophoresis coating
this procedure use for a lot more depth surface cleanness
five)epoxy zinc primer spray coating
this procedure is the long lasting 1 prior to paiting .soon after this procedure the trailer an be paiting
six)assembly
right after all the process we have mationed .the previous process of the trailer is assembly.this process all the parts will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake program and so on
7)packing
The final method is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer