1.Product parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany kind can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/9./8./8.5 |
kingpin | 2"/three.five" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | 1 |
air wiring | doule air line |
electrical energy wiring | 6 main wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma chopping device cut the metal to minor areas use for appropriate welding and splicing
two)welding
soon after metal slicing method the up coming phase is welding .this procedure the primary perform is beam welding .the best plate-bottom plate and the
middle plate will be welding together . this approach will be use submerged arc welding method.this type of welding is very
specific .its exclusively used in I beam welding .after this welding approach other areas of the trailer will be use various welding way
for diverse steel-argon arc welding-electric powered arc welding-manual welding-fuel welding and so on
three)blasting
this method is use for the 1st action of area cleanness-pressure reduction-derusting prior to paiting .
four)electrophoresis coating
this approach use for far more detail floor cleanness
5)epoxy zinc primer spray coating
this process is the long lasting a single before paiting .right after this method the trailer an be paiting
6)assembly
soon after all the procedure we have mationed .the last treatment of the trailer is assembly.this method all the areas will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake technique and so on
7)packing
The very last process is packing .all the trailer use diverse packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer