one.Product parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany type can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./eight./eight.5 |
kingpin | two"/three.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | one |
air wiring | doule air line |
electricity wiring | 6 core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma slicing equipment minimize the metal to minor parts use for appropriate welding and splicing
two)welding
following steel chopping process the next stage is welding .this procedure the primary work is beam welding .the prime plate-bottom plate and the
middle plate will be welding jointly . this procedure will be use submerged arc welding approach.this sort of welding is quite
special .its completely utilized in I beam welding .right after this welding method other areas of the trailer will be use different welding way
for various metal-argon arc welding-electrical arc welding-handbook welding-fuel welding and so on
3)blasting
this method is use for the initial phase of surface cleanness-stress aid-derusting before paiting .
4)electrophoresis coating
this method use for far more element floor cleanness
five)epoxy zinc primer spray coating
this approach is the lasting one particular before paiting .right after this procedure the trailer an be paiting
6)assembly
after all the method we have mationed .the last treatment of the trailer is assembly.this procedure all the components will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake program and so on
7)packing
The previous procedure is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer