one.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany kind can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/nine./8./8.5 |
kingpin | 2"/three.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
tool box | 1 |
air wiring | doule air line |
electrical power wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma slicing machine reduce the metal to minor components use for ideal welding and splicing
2)welding
right after metal slicing method the subsequent phase is welding .this method the primary perform is beam welding .the top plate-bottom plate and the
middle plate will be welding collectively . this method will be use submerged arc welding approach.this type of welding is very
specific .its exclusively employed in I beam welding .soon after this welding method other areas of the trailer will be use various welding way
for various metal-argon arc welding-electric powered arc welding-handbook welding-fuel welding and so on
three)blasting
this process is use for the 1st phase of area cleanness-stress reduction-derusting before paiting .
four)electrophoresis coating
this approach use for much more depth surface area cleanness
5)epoxy zinc primer spray coating
this approach is the long lasting 1 ahead of paiting .right after this process the trailer an be paiting
six)assembly
soon after all the method we have mationed .the very last process of the trailer is assembly.this method all the areas will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake technique and so on
seven)packing
The previous procedure is packing .all the trailer use diverse packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer