one.Product parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany kind can be opentional |
tire | 11R22.5/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/nine./eight./eight.5 |
kingpin | two"/3.five" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | one |
air wiring | doule air line |
electrical energy wiring | six main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma chopping device reduce the metal to minor parts use for suited welding and splicing
2)welding
following metal chopping approach the subsequent stage is welding .this procedure the main operate is beam welding .the best plate-base plate and the
middle plate will be welding jointly . this process will be use submerged arc welding approach.this variety of welding is extremely
special .its solely used in I beam welding .after this welding approach other parts of the trailer will be use distinct welding way
for different steel-argon arc welding-electrical arc welding-manual welding-fuel welding and so on
three)blasting
this procedure is use for the very first step of surface cleanness-anxiety relief-derusting before paiting .
4)electrophoresis coating
this approach use for much more depth area cleanness
5)epoxy zinc primer spray coating
this method is the long lasting one particular prior to paiting .after this method the trailer an be paiting
six)assembly
soon after all the process we have mationed .the previous procedure of the trailer is assembly.this procedure all the elements will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake system and so on
seven)packing
The final process is packing .all the trailer use different packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer