one.Solution parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany kind can be opentional |
tire | 11R22.5/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./8./eight.5 |
kingpin | 2"/3.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | 1 |
air wiring | doule air line |
electrical power wiring | six main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma chopping device minimize the steel to minor parts use for ideal welding and splicing
2)welding
after metal slicing procedure the up coming stage is welding .this process the main perform is beam welding .the leading plate-base plate and the
middle plate will be welding with each other . this procedure will be use submerged arc welding process.this kind of welding is very
unique .its solely employed in I beam welding .following this welding process other parts of the trailer will be use distinct welding way
for various steel-argon arc welding-electrical arc welding-guide welding-gas welding and so on
3)blasting
this procedure is use for the initial stage of surface cleanness-anxiety reduction-derusting prior to paiting .
4)electrophoresis coating
this method use for a lot more element area cleanness
five)epoxy zinc primer spray coating
this method is the lasting 1 ahead of paiting .soon after this approach the trailer an be paiting
6)assembly
after all the approach we have mationed .the final treatment of the trailer is assembly.this approach all the parts will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake technique and so on
seven)packing
The very last process is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer