one.Product parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany kind can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./8./8.5 |
kingpin | 2"/3.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | 1 |
air wiring | doule air line |
electricity wiring | 6 main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma slicing machine reduce the steel to little parts use for ideal welding and splicing
two)welding
soon after steel chopping procedure the up coming action is welding .this method the main function is beam welding .the prime plate-bottom plate and the
middle plate will be welding together . this approach will be use submerged arc welding procedure.this type of welding is extremely
particular .its exclusively employed in I beam welding .right after this welding procedure other areas of the trailer will be use various welding way
for distinct steel-argon arc welding-electric arc welding-manual welding-fuel welding and so on
3)blasting
this approach is use for the 1st phase of area cleanness-tension relief-derusting ahead of paiting .
four)electrophoresis coating
this procedure use for much more element area cleanness
five)epoxy zinc primer spray coating
this method is the lasting one particular just before paiting .following this approach the trailer an be paiting
six)assembly
following all the approach we have mationed .the previous process of the trailer is assembly.this procedure all the elements will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake technique and so on
7)packing
The very last approach is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer