one.Item parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany variety can be opentional |
tire | 11R22.five/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./8./eight.5 |
kingpin | two"/three.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
tool box | 1 |
air wiring | doule air line |
electric power wiring | 6 main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma slicing equipment lower the steel to little elements use for ideal welding and splicing
two)welding
right after steel slicing procedure the up coming stage is welding .this method the main perform is beam welding .the top plate-base plate and the
middle plate will be welding together . this method will be use submerged arc welding procedure.this sort of welding is really
particular .its completely utilized in I beam welding .following this welding procedure other components of the trailer will be use various welding way
for distinct steel-argon arc welding-electric arc welding-guide welding-fuel welding and so on
3)blasting
this method is use for the first phase of floor cleanness-tension reduction-derusting just before paiting .
4)electrophoresis coating
this approach use for far more element area cleanness
5)epoxy zinc primer spray coating
this approach is the long lasting 1 before paiting .right after this approach the trailer an be paiting
six)assembly
right after all the procedure we have mationed .the very last method of the trailer is assembly.this procedure all the elements will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake method and so on
seven)packing
The last process is packing .all the trailer use different packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer