Low Cost 80ton Lowboy/Lowbed/Reduced Bed JCPT Working Ramp Truck Semi Trailer 3 Axles thirty-50tons Reduced Mattress Semi Truck Trailer
Principal Functionality
Item Specification | ||||
one | Sort | Semitrailer | ||
two | Item Title | Reduced Bed Semitrailer | ||
3 | Dimension | 13000x3000x1600mm | ||
four | Tare Bodyweight | 9210kg | ||
five | Payload | 42t | ||
six
|
Operating Technique | Axles | FUWA , BPW, HUAJIN model,13t/16t/20t Good high quality axles | |
Suspension | Tri-axle 10-pcs leaf spring suspension with equalizer beam (we can decide on the Air suspension depend on JCPTer requirement) |
|||
Tires | Linglong, Double Coin, Triangle brand 11.00R20/eight.25R20/twelve.00R22.5, 12unit | |||
7 | Ladder | Manually operated or JCPT variety | ||
eight | Braking System | Dual lines pneumatic brake system, WABCO Emergency Relay Valve KORMEE Stomach muscles braking program |
||
9 | Body | Main Beam | Q345B steel,Height 500, upper 16mm, lower 18mm. Mid web 10mm |
|
Cross Beam | Mild Alloy Q235 | |||
10 | King Pin | Dimension: 50# (2'') or 90#(3.5'') Type: welded or assembled | ||
eleven | Landing Gear | FUWA, JOST Brand name Single side operation or double side operation, Static capacity 28Ton |
||
12 | Electrical & Paint | Electrical | Rear light, rear reflector, turn indicative light, side reflector, fog lamp, number plate light | |
JCPTs & Reflectors | 24V, 7 lines | |||
Painting | zinc-wealthy primer and modified urethane topcoat as JCPTers' selections. | |||
Components | Instrument BOX (BOX ONLY)---Supplied WITH THE TRAILER TWO SPARE WHEEL HOLDER(WINCH),BUT NO SPARE TYRES |
I.The Application and the Technical Highlights:
---The low mattress semitrailers are largely suitable for the MID/Long distance transportation of mechanical products, massive objects, highway building products, huge tanks, electricity plant products or machine, and all types of metal goods.
---The minimal bed semitrailer can mattress divide into flat bed reduced bed trailer, concave minimal mattress trailer, tyres show up reduced bed trailer, tyres lined low mattress trailer. The concave minimal bed trailer structured with tyre appeared type, the height of the cargo's carrying system from floor is 900mm.-Minimal system tends to make the stable transportation.
---The chassis is ladder variety,longitudinal beam section is H-formed. It has excellent rigidity and high strength.
--- Higher Top quality Body and substantial-tensile steel for weighty loading capacity
--- BPW, FUWA or Certificated Chinese Axles
---Ab muscles brake program
---WABCO Car Control Technique
---JOST ,FUWA or Chinese manufacturer parking leg and king pin
---Air and Mechanical Suspension
---Strengthen the Chassis Instructure
II.The Advantage
***Body:using the innovative assembly welded equipments to weld the room frame framework which shaped by welded-kind longitudinal beam (made of 16Mn steel plate) and the complete Run-by way of cross beam.Our take into account the toughness,stiffness and toughness of the frame and style the body is robust enough to have the hefty cargo.
***Suspension: JCPTweight layout.Large-energy content with robust carrying potential, remarkable dress in resistance house and performance security and lengthy provider existence.Wheel Monitor adjustable simply and properly, which shield the tires from irregular dress in.Passed stringent bench screening and street tests.
***Axle:Specially processed one particular-piece spindle of higher top quality reduced alloy metal, which possesses powerful loading potential, lengthy existence, mild bodyweight and outstanding efficiency.High machining precision of the braking program tends to make the braking performance far more secure.
III.Sophisticated Method
~~~Design Drawing: Prior to generation, we will despatched the design drawing to our JCPTer to confirm the depth of the automobile. We hope we can source the most suited product to our JCPTer.
~~~Cutting and Welding: The I beam chopping adopt the Computer Numerical Manage Plasma Cutting Equipment. The I beam welding undertake the Gantry Main Sill Welding Device.
~~~The Beam Welding: Major beam and aspect beam all use I-formed beam, it can make sure the trailer a lot more durable.Reinforced rear plate can avoid the rear plate was damaged away when hefty duty equipment climbing the ramp of trailer.
~~~Surface Therapy: In get to get rid of the rust of the trailer physique, we use the sand blasting to retreat the surface area of the trailer.
The trailer can have the lovely appearance,the painting will be coating evenly, firm adhension, gloss a lot more tough
~~~Portray: One layer of the anti-rust painting, two layer of painting
~~~Examination: We will test the high quality of the trailer ahead of shipping.
IV.The Element of the Lower Bed Trailer
V. Classification Of The Reduced Bed Trailer
VI. Guarrantee For The Areas Of The Low Mattress Traielr:
ITEM NAME | Warranty | ITEM NAME | Warranty | |||
MAIN FRAME | Body | 1 YEAR | RUNNING GEAR | AXLE | 6 MONTHS | |
SUSPENSION | 6 MONTHS | AXLE BEARING | 3 MONTHS | |||
KING PIN | 1 YEAR | WHEEL HUB | 3 MONTHS | |||
BALANCE ARM | 3 MONTHS | |||||
ITEM NAME | Guarantee | ITEM NAME | Warranty | |||
BRAKING DEVICE | BRAKE DRUM | 3 MONTHS | SUPPORT DEVICE | LXIHU (WEST LAKE) DIS. GEAR | 6 MONTHS | |
BRKE CHAMBER | 3 MONTHS | SPARE WHEEL CARRIER | 6 MONTHS | |||
AIR RESERVOIR | 6 MONTHS | |||||
ITEM NAME | Warranty | |||||
Others | LEAF SPRING | 3 MONTHS | ||||
BRAKE CHAMBER DIAPHRAGM | 3 MONTHS | |||||
EMERGENCY RELAY VALVE | 3 MONTHS | |||||
BRAKE SHOE | 3 MONTHS | |||||
RELAY VALVE | 3 MONTHS |
VII. Working Method
one. You ship us an inquiries on your wanted trailer by way of our get in touch with info.
two. We shall reply you in 12 several hours after we received our inquiry.
three. We will negotiate the detail of the trailer on your necessity.
four. Confirmed on the tech info.
five. Indicator deal.
6.30% down payment or LC issuing.
7. Creation
eight. The Manufacturig process with current news.
nine. The Creation completement.
ten.Harmony payment .
11.Organize Shipment and Personalized Clearance
twelve. A/S service for 1 yr.
Tri-Axles Low Mattress Semi Trailer