one.Item parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.5/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.25/9./8./8.5 |
kingpin | 2"/three.five" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
tool box | one |
air wiring | doule air line |
electric power wiring | six main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma cutting device lower the steel to little components use for suitable welding and splicing
2)welding
soon after steel chopping approach the up coming stage is welding .this procedure the main operate is beam welding .the leading plate-bottom plate and the
middle plate will be welding jointly . this procedure will be use submerged arc welding procedure.this sort of welding is quite
specific .its exclusively employed in I beam welding .following this welding process other parts of the trailer will be use various welding way
for different steel-argon arc welding-electric powered arc welding-guide welding-gas welding and so on
3)blasting
this procedure is use for the initial stage of floor cleanness-anxiety aid-derusting ahead of paiting .
four)electrophoresis coating
this process use for much more element surface cleanness
five)epoxy zinc primer spray coating
this process is the long lasting one particular before paiting .after this procedure the trailer an be paiting
6)assembly
after all the approach we have mationed .the last procedure of the trailer is assembly.this process all the elements will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake method and so on
seven)packing
The previous approach is packing .all the trailer use various packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer