1.Solution parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/nine./eight./eight.5 |
kingpin | two"/3.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | one |
air wiring | doule air line |
electricity wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma reducing machine lower the metal to little areas use for suited welding and splicing
2)welding
right after metal reducing method the following step is welding .this procedure the major operate is beam welding .the best plate-bottom plate and the
middle plate will be welding collectively . this process will be use submerged arc welding method.this kind of welding is really
unique .its solely utilised in I beam welding .right after this welding approach other parts of the trailer will be use diverse welding way
for diverse metal-argon arc welding-electrical arc welding-handbook welding-gas welding and so on
3)blasting
this procedure is use for the very first step of surface cleanness-tension relief-derusting ahead of paiting .
4)electrophoresis coating
this process use for far more detail surface cleanness
5)epoxy zinc primer spray coating
this approach is the long lasting 1 just before paiting .right after this process the trailer an be paiting
six)assembly
right after all the procedure we have mationed .the last method of the trailer is assembly.this method all the parts will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake method and so on
7)packing
The previous method is packing .all the trailer use diverse packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer