one.Solution parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany type can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./eight./8.5 |
kingpin | two"/3.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | 1 |
air wiring | doule air line |
electric power wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma chopping equipment lower the steel to minor elements use for appropriate welding and splicing
two)welding
after metal cutting process the up coming action is welding .this approach the major perform is beam welding .the top plate-bottom plate and the
middle plate will be welding collectively . this approach will be use submerged arc welding procedure.this kind of welding is quite
unique .its exclusively utilised in I beam welding .after this welding procedure other elements of the trailer will be use distinct welding way
for different metal-argon arc welding-electric powered arc welding-handbook welding-gasoline welding and so on
3)blasting
this method is use for the first stage of surface area cleanness-stress relief-derusting before paiting .
4)electrophoresis coating
this process use for far more element surface area cleanness
five)epoxy zinc primer spray coating
this process is the long lasting 1 just before paiting .following this approach the trailer an be paiting
six)assembly
following all the approach we have mationed .the very last process of the trailer is assembly.this process all the areas will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on
seven)packing
The last method is packing .all the trailer use diverse packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer