1.Item parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany variety can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/9./8./8.5 |
kingpin | 2"/3.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | one |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma chopping device reduce the steel to tiny elements use for appropriate welding and splicing
two)welding
soon after steel chopping process the subsequent stage is welding .this approach the principal work is beam welding .the best plate-bottom plate and the
middle plate will be welding with each other . this method will be use submerged arc welding process.this type of welding is really
unique .its exclusively utilized in I beam welding .after this welding procedure other components of the trailer will be use different welding way
for diverse metal-argon arc welding-electric arc welding-guide welding-gas welding and so on
3)blasting
this method is use for the initial step of area cleanness-anxiety aid-derusting just before paiting .
4)electrophoresis coating
this procedure use for far more element area cleanness
5)epoxy zinc primer spray coating
this method is the lasting one particular before paiting .after this method the trailer an be paiting
six)assembly
after all the approach we have mationed .the previous process of the trailer is assembly.this approach all the parts will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on
7)packing
The previous approach is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer