Triple BPW Axles Mechanical Suspension Low Loading Deck Lowboy Semi Trailer

Triple BPW Axles Mechanical Suspension Low Loading Deck Lowboy Semi Trailer

1.Item parameters
 

measurement 13000mm*2550*3440
payload 60ton 
tare weight  7000kg
axle 3x13ton/14ton/16ton/20ton   brand can be opentional 
suspension  mechanical suspension/air suspension/american sort/germany variety can be opentional
tire 11R22.5/12R22.five/eleven.00R20/12.00R20    brand can be opentional 
wheel rim eight.25/9./8./8.5 
kingpin  2"/3.5"
I  beam  up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm:
content:Q345B/T700
landing gear  jost c200 /fuwa  two pace 28ton 
ground 3mm checkered plate
twist lock  Optional
spare tire carrier  2 pcs 
tool box one
air wiring  doule air line 
electric power wiring 6 core wiring24v or 12v LED lamp
brake program wabco relay valvedrum braket30/30 brake chamber 
paiting  comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2  coats of last paiting
colour  Optional
accessories  brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp

2.Normal Procedure

1)cutting  
use the plasma chopping device reduce the steel to tiny elements use for appropriate welding and splicing
 
two)welding  
soon after steel chopping process the subsequent stage is welding .this approach the principal work is beam welding .the best plate-bottom plate and the
middle  plate  will  be welding with each other .  this method will be use submerged arc welding process.this type of welding is really
unique .its exclusively utilized in I beam welding .after this welding procedure other components of the trailer will be use different welding way
for diverse metal-argon arc welding-electric arc welding-guide welding-gas welding and so on
 
3)blasting
this method is use for the initial step of area cleanness-anxiety aid-derusting just before paiting .
 
4)electrophoresis coating  
this procedure use for far more element area cleanness
 
5)epoxy zinc primer spray coating 
this method is the lasting one particular before paiting .after this method the trailer an be paiting
 
six)assembly
after all the approach we have mationed .the previous process of the trailer is assembly.this approach all the parts will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on

7)packing 
The previous approach is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer

 

Triple BPW Axles Mechanical Suspension Low Loading Deck Lowboy Semi Trailer

Tags: