one.Product parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany variety can be opentional |
tire | 11R22.five/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./8./8.5 |
kingpin | two"/three.5" |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | 1 |
air wiring | doule air line |
electricity wiring | six main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma cutting equipment lower the steel to tiny components use for ideal welding and splicing
2)welding
after steel cutting procedure the subsequent step is welding .this process the major function is beam welding .the best plate-bottom plate and the
middle plate will be welding jointly . this approach will be use submerged arc welding procedure.this sort of welding is really
particular .its exclusively employed in I beam welding .soon after this welding method other elements of the trailer will be use distinct welding way
for diverse metal-argon arc welding-electrical arc welding-guide welding-gasoline welding and so on
three)blasting
this procedure is use for the very first phase of surface cleanness-anxiety reduction-derusting prior to paiting .
four)electrophoresis coating
this method use for much more element surface area cleanness
5)epoxy zinc primer spray coating
this method is the lasting one particular before paiting .after this procedure the trailer an be paiting
six)assembly
following all the approach we have mationed .the previous procedure of the trailer is assembly.this approach all the areas will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
seven)packing
The last approach is packing .all the trailer use diverse packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer