Two or Three Axles Transport Containers 40FT Flatbed Trailer

Two or Three Axles Transport Containers 40FT Flatbed Trailer

one.Product parameters
 

dimension 13000mm*2550*3440
payload 60ton 
tare weight  7000kg
axle 3x13ton/14ton/16ton/20ton   brand can be opentional 
suspension  mechanical suspension/air suspension/american variety/germany variety can be opentional
tire 11R22.five/12R22.five/11.00R20/12.00R20    brand can be opentional 
wheel rim 8.twenty five/9./8./8.5 
kingpin  two"/three.5"
I  beam  up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm:
material:Q345B/T700
landing gear  jost c200 /fuwa  two pace 28ton 
ground 3mm checkered plate
twist lock  Optional
spare tire carrier  2 pcs 
resource box 1
air wiring  doule air line 
electricity wiring six main wiring24v or 12v LED lamp
brake program wabco relay valvedrum braket30/30 brake chamber 
paiting  total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2  coats of closing paiting
colour  Optional
accessories  brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp

two.Normal Procedure

1)cutting  
use the plasma cutting equipment lower the steel to tiny components use for ideal welding and splicing
 
2)welding  
after steel cutting procedure the subsequent step is welding .this process the major function is beam welding .the best plate-bottom plate and the
middle  plate  will  be welding jointly .  this approach will be use submerged arc welding procedure.this sort of welding is really
particular .its exclusively employed in I beam welding .soon after this welding method other elements of the trailer will be use distinct welding way
for diverse metal-argon arc welding-electrical arc welding-guide welding-gasoline welding and so on
 
three)blasting
this procedure is use for the very first phase of surface cleanness-anxiety reduction-derusting prior to paiting .
 
four)electrophoresis coating  
this method use for much more element surface area cleanness
 
5)epoxy zinc primer spray coating 
this method is the lasting one particular before paiting .after this procedure the trailer an be paiting
 
six)assembly
following all the approach we have mationed .the previous procedure of the trailer is assembly.this approach all the areas will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on

seven)packing 
The last approach is packing .all the trailer use diverse packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer

 

Two or Three Axles Transport Containers 40FT Flatbed Trailer

Tags: